Apollo 13 - Full mission 26 - Press Conference
15th April Press Conference (right channel) and simultaneous communications with the spacecraft (left channel)
|
|
Apollo 13 - Full mission 27 - The CM is Getting Chilly
Fred Haise is watching while Lovell and Swigert tried to sleep in the CM
|
|
Apollo 13 - Full mission 28 - Turn Off the LRL
Conversations about the next mid course correction, venting and Earth re-entry.
|
|
Apollo 13 - Full mission 29 - A Square Peg in a Round Hole
The construction of the box that was needed to use the LMs CO2 scrubber recepticle with the CMs lithium hydroxide canisters.
|
|
Apollo 13 - Full mission 30 - Powerup Procedure
Discussions on powering up the spacecraft - and further instructions about the CO2 scrubbing system.
|
|